ANALYSIS OF CRITERIA AFFECTING THE EFFECTIVENESS OF IMPLEMENTING SELF-MANAGED CONSTRUCTION PROJECTS BASED ON COMMUNITY EMPOWERMENT AND CONTRACTUALITY
Main Article Content
Aki’ Suprapto*
Esti Wulandari
Hanie Teki Tjendani
With the dominance of top-down development, the aspirations of the community's ideas in every stage of construction development are not perfectly absorbed, resulting in community antipathy towards every government policy. Therefore, to recreate public sympathy, the government released a program to strengthen village governance and development (P3PD) or better known as the village fund program. The AHP (Analytical Hierarchy Process) method is used to analyze the results of the questionnaire so that the weight value of the criteria and sub criteria can be known as the basis for selecting the implementation of construction activities. Based on the results of the analysis, the weight value of the criteria can be found as follows: quality criteria are the main criteria in the selection of construction projects with a weight of 0.235, cost with a weight of 0.203, time with a weight of 0.192, community participation with a weight of 0.144, labor with a weight of 0.117 and administration with a weight of 0.110.
Aziiz, M. N., & Prastiti, S. D. (2019). Faktor-faktor yang mempengaruhi akuntabilitas dana desa. Jurnal Akuntansi Aktual, 6(2), 334–344.
Cahyono, L., Apriani, M., Nugraha, A. T., & Utomo, A. P. (2022). Potensi Risiko Waktu Pelaksanaan Proyek Swakelola di Kabupaten Pasuruan melalui Program Kotaku Kementerian PUPR. Jurnal Spektran, 10(2), 118.
Muhendra, H., & Hasibuan, S. (2018). Seleksi Sub-Kontraktor Proyek Konstruksi Jalan Layang. Jurnal Manajemen Transportasi & Logistik (JMTRANSLOG), 5(1), 43–54.
Muhendra, H., Hasibuan, S., & Buana, U. M. (n.d.). Seleksi Sub-Kontraktor Proyek Konstruksi Jalan Layang The Sub-Contractor Selection of Fly Over Construction Project. 05(01), 43–54.
Nahruddin, Z. (2014). Akuntabilitas dan transparansi pengelolaan dana alokasi desa Di desa pao-pao kecamatan tanete rilau Kabupaten barru. Otoritas: Jurnal Ilmu Pemerintahan, 4(2).
Nugroho, L. D., Witjaksana, B., Oetomo, W., & Setiawan, A. (2019). Analysis of Construction Contract Project Comparison with PNPM Based Projects in Construction Projects (PPIP Project Implementation Study in Tuban District). Journal of Physics: Conference Series, 1364(1), 12052.
Setiawan, A. (2017). Analisis Perbandingan Proyek Kontrak Konstruksi Dengan Proyek Berbasis PNPM Pada Proyek Konstruksi (Studi Kasus Pelaksanaan Proyek PPIP Di Kabupaten Tuban). Universitas 17 Agustus 1945.
Soetjipto, J. W., Hanafi, M. N., & Sukmawati, S. (2021). Sistem Pengambilan Keputusan Metode Konstruksi Berbasis Analytical Hierarchy Process. Konstruksia, 12(2), 1–13.
Yulianto, A. H., Witjaksana, B., & Tjendani, H. T. (2022). Perencanaan Teknis Dan Biaya Kontruksi Tempat Pembuangan Sementara (Tps) Sampah Berbasis Masyarakat Desa Pinggir Papas Kecamatan Kalianget Kabupaten Sumenep. Senakama: Prosiding Seminar Nasional Karya Ilmiah Mahasiswa, 1(1), 87–97.
Zulkarnain, I. (2019). Model Penetapan Proyek Konstruksi Sistem Kontraktual Atau Berbasis Pemberdayaan Masyarakat. Teknologi Sipil, 1.