TIME ANALYSIS OF THE MIXING PROCESS OF FIRE BRICK MATERIALS IN PT. BENTENG API TECHNIC GRESIK
Main Article Content
Andika Puji Wirawan*
Zainal Arief
PT. Benteng Api Technic is a leading refractory company in Indonesia with refractory bricks as one of its superior products. The process of making refractory bricks that will be observed in this study is the process of mixing materials and the molding process. In the mixing process, there are no tools in the form of time indicators to help operators make decisions about the mixing time of ingredients. This research aims to obtain the time for the mixing of materials with maximum mixing quality and to support the press process optimally. The research was conducted using a perfectly randomized experimental design in order to obtain different mixing results based on the nine selected mixing time treatments. Measurement of working time is carried out using the stopwatch time study method on press operators who are experienced in their fields. Calculations to align the two processes using a Gantt chart with idle time as an indicator. The experimental results revealed that the most optimal mixing with a mixing time of 12 minutes resulted in 7.2 kilograms of mass that did not pass through an 18 mesh sieve. Based on the results of the gantt chart, the use of 11 mixing time for material B resulted in the lowest idle time of 178 minutes. The processing time obtained is expected to be used as a guide in determining the time input on the time indicator tool in the process of mixing refractory bricks.
Asadi, B., & Vahidi, A. (2010). Predictive cruise control: Utilizing upcoming traffic signal information for improving fuel economy and reducing trip time. IEEE Transactions on Control Systems Technology, 19(3), 707–714.
Febrianto, T. (2021). Studi Eksperimen Pengaruh Tekanan Dan Suhu Sintering Terhadap Densitas Paduan Al-Mg Dengan Metode Metalurgi Serbuk. Universitas 17 Agustus 1945 Surabaya.
Geraldi, J., & Lechter, T. (2012). Gantt charts revisited: A critical analysis of its roots and implications to the management of projects today. International Journal of Managing Projects in Business.
Ghafoorpoor Yazdi, P., Azizi, A., & Hashemipour, M. (2019). A hybrid methodology for validation of optimization solutions effects on manufacturing sustainability with time study and simulation approach for SMEs. Sustainability, 11(5), 1454.
Khattab, M., Hachemi, S., & Al Ajlouni, M. F. (2021). Evaluating the physical and mechanical properties of concrete prepared with recycled refractory brick aggregates after elevated temperatures’ exposure. Construction and Building Materials, 311, 125351.
Kumar, P. P. (2005). Effective use of Gantt chart for managing large scale projects. Cost Engineering, 47(7), 14.
Leonardi, P. M. (2011). When flexible routines meet flexible technologies: Affordance, constraint, and the imbrication of human and material agencies. MIS Quarterly, 147–167.
Montazeri-Gh, M., Poursamad, A., & Ghalichi, B. (2006). Application of genetic algorithm for optimization of control strategy in parallel hybrid electric vehicles. Journal of the Franklin Institute, 343(4–5), 420–435.
Nguyen, V. H. (2009). Effects of laboratory mixing methods and RAP materials on performance of hot recycled asphalt mixtures [Doctoral dissertation]. University of Nottingham.
Ong, H. Y., Wang, C., & Zainon, N. (2016). Integrated earned value Gantt chart (EV-Gantt) tool for project portfolio planning and monitoring optimization. Engineering Management Journal, 28(1), 39–53.
Rifka, R. N. (2017). Step by Step Lancar Membuat SOP. Penerbit Nauli Media.
Seymour, T., & Hussein, S. (2014). The history of project management. International Journal of Management & Information Systems (IJMIS), 18(4), 233–240.
Shrouf, F., & Miragliotta, G. (2015). Energy management based on Internet of Things: practices and framework for adoption in production management. Journal of Cleaner Production, 100, 235–246.