INTEGRATED CONTROL PROJECT BASED ON COST AND TIME
(Implementation Case Study on Job Creation Construction of Videotron LED 6m x 12m in size Baliwerti Project Surabaya)
Main Article Content
Andrian Firdaus Yusuf Al- Qordhowi*
Muaffaq A. Jani
Hary Moetriono
The development and growth of the adult advertising industry in Indonesia is progressing rapidly, characterized by a wide range of advertising models and types. Surabaya, the second largest metropolis after Jakarta, is also actively engaged in the competition for advertisers. In this study, an analysis of the concept of value was conducted using Microsoft Project 2007. By inputting data relevant to the analysis into the program, Microsoft Project automatically performs the necessary calculations according to the predefined formulas. This automation ensures that the results of the value analysis are obtained more quickly and accurately. Based on the above study, it can be concluded that the total forecasted cost of completing the project is Rp. 743,346,765.76, with the project's total incurred cost up to the 9th week being Rp. 679,044,258.74. Consequently, there is a cost savings of Rp. 64,302,507.02, equivalent to an efficiency of 9%. The projected completion time for the project is June 20, 2014 (60 days), but with potential completion in just 51 days, allowing for a nine-day advancement from the planned schedule.
Asiyanto. (2005). Construction Project Cost Management. Jakarta: PT. PadnyaParamita.
Chandra, H. P., et al. (n.d.). Pengendalian Pelaksanaan Konstruksi Berdasarkan Konsep Nilai Hasil Pada Pembangunan Pabrik X di Gresik. Jurnal Jurusan Teknik Sipil, Fakultas Teknik Sipil dan Perencanaan Universitas Kristen Petra. Retrieved from www.google.com (Accessed 7 May 2010).
Dipohusodo, I. (1996). Manajemen Proyek & Konstruksi Jilid II. Yogyakarta: Kanisius.
Ervianto, W. I. (2004). Teori-Aplikasi Manajemen Proyek Konstruksi. Yogyakarta: Andi.
Flemming, Q. W. & Koppelman, J. M. (1994). Earned Value Analysis Terhadap Waktu Pada Proyek Pembangunan Gedung. Skripsi, Jurusan Teknik Sipil Fakultas Teknik Universitas Sebelas Maret Surakarta.
Hafidy, H. (2007). Analisa Kinerja Proyek Dengan Metode Earned Value pada Proyek Pembangunan Pelabuhan Laut Boom Tahap I Kabupaten Banyuwangi Jawa Timur. Tugas Akhir, Jurusan Teknik Sipil Fakultas Teknik dan Perencanaan Institut Teknologi Sepuluh Nopember Surabaya.
Imam, S. (1999). Manajemen Proyek Jilid 1. Surabaya: Erlangga.
Kusrianto, A. (2008). Panduan Lengkap Memakai Microsoft Project 2007. Jakarta: PT. Elex Media Komputindo.
Levin, R. I., Kirkpatrick, C. A., & Jamin, M. A. (1972). Perentjanaan dan Pengawasan dengan PERT dan CPM: Teknik Menilai dan Mempertimbangkan Program dan Metode Djelur Kritis. Bhratara.
Margianto, T. S. & Suprapto, H. (2006). Seminar Ilmiah Nasional Komputer dan Sistem Intelijen (KOMMIT 2006). Auditorium Universitas Gunadarma, Depok.
Rahman, I. (2010). Earned Value Analysis Terhadap Waktu Pada Proyek Pembangunan Gedung. Skripsi, Jurusan Teknik Sipil Fakultas Teknik Universitas Sebelas Maret Surakarta.
Soeharto, I. (1997). Katalog Dalam Terbitan, Manajemen Proyek: Dari Konseptual Sampai Operasional. Cetakan.
Soeharto, I. (2001). Manajemen Proyek Dari Konseptual Sampai Operasional. Jakarta: Erlangga.
Sumardi, B. W., et al. (n.d.). Konsep Earned Value untuk Pengelolaan Proyek Konstruksi. Fakultas Teknik Sipil dan Lingkungan, Institut Teknologi Bandung. Retrieved from www.google.com (Accessed 8 Maret 2010).
Sudarsana, D. K. (2008). Pengendalian Biaya Dan Jadual Terpadu pada Proyek Konstruksi. Jurnal Ilmiah Teknik Sipil Fakultas Teknik Universitas Udayana, Denpasar.
Sumaryani. (2010). Earned Value Analysis of Parking Building Construction Project Two Wheels Four Floors of UMS With Microsoft Project 2007. Skripsi Teknik Sipil Universitas Sebelas Maret, Surakarta.