[1]
Purnomo, D., Oetomo, W. and Marleno, R. 2024. STUDY OF COST AND TIME ANALYSIS USING THE TIME COST TRADE-OFF (TCTO) METHOD IN THE CONSTRUCTION PROJECT OF THE OFFICE BUILDING OF A GOVERNMENT AGENCY (OPD) IN PASURUAN. INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM . 2, 4 (Jan. 2024), 376–386. DOI:https://doi.org/10.55047/ijateis.v2i4.1007.