[1]
Putra, H.R., Koespiadi, K. and Oetomo, W. 2024. TIME AND COST ACCELERATION ANALYSIS USING CRASHING METHOD (CASE STUDY: TANJUNG UNCANG JETTY CONSTRUCTION PROJECT BATAM CITY). INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM . 3, 1 (Jan. 2024), 82–91. DOI:https://doi.org/10.55047/ijateis.v3i1.1018.