[1]
Balido, P.T.S., Tjendani, H.T. and Witjaksana, B. 2024. ANALYSIS OF IMPLEMENTATION DELAYS USING THE EARNED VALUE METHOD (ON THE PURWOSARI - SEKARMOJO ROAD WORKS, PASURUAN DISTRICT). INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM . 3, 1 (Jan. 2024), 105–118. DOI:https://doi.org/10.55047/ijateis.v3i1.1022.