[1]
Pramadha, I.Y., Tjendani, H.T. and Witjaksana, B. 2024. COST AND TIME ANALYSIS USING EARNED VALUE METHOD ON THE CONSTRUCTION OF THE NATIONAL KEDIRI AIRPORT ACCESS ROAD PHASE 1 KEDIRI - NGANJUK. INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM . 3, 1 (Jan. 2024), 119–130. DOI:https://doi.org/10.55047/ijateis.v3i1.1023.