[1]
Harris, O., Marleno, R. and Oetomo, W. 2024. EVALUATION OF COST AND TIME PERFORMANCE OF KARETAN - SAMBIMULYO ROAD MAINTENANCE PROJECT IN BANYUWANGI DISTRICT . INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM . 2, 4 (Jan. 2024), 433–442. DOI:https://doi.org/10.55047/ijateis.v2i4.1045.