[1]
Irniawan, D., Oetomo, W. and Marleno, R. 2024. COST AND TIME ANALYSIS USING EARNED VALUE METHOD IN ADMINISTRATION BUILDING CONTRUCTION PROJECT AT POLIJE CAMPUS. INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM . 2, 4 (Jan. 2024), 423–432. DOI:https://doi.org/10.55047/ijateis.v2i4.1059.