[1]
Nailufar, L., Witjaksana, B. and Wulandari , E. 2024. ANALYSIS OF PROJECT ENFORCEMENT DELAYS WITH THE EARNED VALUE METHOD: (Case study: Office of Bahtera Elang Perak Indonesia Surabaya). INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM. 3, 3 (Jul. 2024), 317–330. DOI:https://doi.org/10.55047/ijateis.v3i3.1167.