[1]
Saputra, E.O., Muhammadun, H. and Marleno, R. 2024. COST AND TIME PERFORMANCE ANALYSIS USING EARNED VALUE METHOD OF WHEAT SILO & PELLET SILO STRUCTURE REPAIR PROJECT PHASE 3 PT. ISM BOGASARI SURABAYA. INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM. 3, 3 (Jul. 2024), 356–369. DOI:https://doi.org/10.55047/ijateis.v3i3.1244.