[1]
Sartiyana, I.K.R., Nugroho, L.D. and Muhammadun, H. 2025. Time and Cost Control Analysis of the Construction of the Joyoboyo Zoo Intermodal Terminal Pedestrian Tunnel Using the Critical Path Method . INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM. 4, 1 (Jan. 2025), 18–25. DOI:https://doi.org/10.55047/ijateis.v4i1.1566.