[1]
Rudiansyah, R., Tjendani, H.T. and Puspanantasari, E. 2025. Time and Cost Analysis Using the Fast Track Method in the ITS Bank Building Construction Project. INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM. 4, 3 (Jul. 2025), 373–382. DOI:https://doi.org/10.55047/ijateis.v4i3.1824.