[1]
Al- Qordhowi, A.F.Y., Jani, M.A. and Moetriono, H. 2023. INTEGRATED CONTROL PROJECT BASED ON COST AND TIME: (Implementation Case Study on Job Creation Construction of Videotron LED 6m x 12m in size Baliwerti Project Surabaya). INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM . 2, 1 (Mar. 2023), 52–73. DOI:https://doi.org/10.55047/ijateis.v2i1.695.