[1]
Prasetiyo W., A., Oetomo, W. and Wulandari, E. 2023. COMPARATIVE ANALYSIS OF ACCELERATION ALTERNATIVES FOR THE DRAINAGE CHANNEL PROJECT ON XYZ STREET USINGTHE TIME-COST TRADE-OFF (TCTO) METHOD. INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM . 2, 3 (Oct. 2023), 155–174. DOI:https://doi.org/10.55047/ijateis.v2i3.882.