[1]
Ariyanto, S., Tjendani, H.T. and Witjaksana, B. 2024. TIME AND COST ACCELERATION ANALYSIS USING CRASHING METHOD WITH ADDITIONAL WORKING HOURS IN THE CONSTRUCTION PROJECT OF KAPAS – GLENDENG 8 BRIDGE, BOJONEGORO DISTRICT. INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM . 2, 4 (Jan. 2024), 273–293. DOI:https://doi.org/10.55047/ijateis.v2i4.974.