[1]
Prasetyo, D., Oetomo, W. and Sajiyo , S. 2024. EVALUATION OF THE APPLICATION OF SMK3 IN PCI GIRDER ERECTION WORK USING A CRAWLER CRANE: (Case Study: Construction of Probolinggo - Banyuwangi Toll Road Package 1 Sta -3+881 - Sta 09+00 At Bridge Sta -3+256 Span 40.8 Meters). INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM . 3, 1 (Jan. 2024), 1–9. DOI:https://doi.org/10.55047/ijateis.v3i1.981.