[1]
Nugraha, B.A., Tjendani, H.T. and Witjaksana, B. 2024. COST AND TIME ANALYSIS USING THE CRASHING METHOD ON THE PROBOLINGGO – BANYUWANGI TOLL ROAD PROJECT PEKET 2: STA 9+000 – 20+200. INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM . 2, 4 (Jan. 2024), 387–399. DOI:https://doi.org/10.55047/ijateis.v2i4.984.