[1]
Riduwan, S.P., Witjaksana, B. and TJendani, H.T. 2024. COST ANALYSIS ON THE CONSTRUCTION OF SPORTS FACILITIES IN KEDEWAN SUB-DISTRICT, BOJONEGORO DISTRICT WITH EVM (EARNED VALUE METHOD). INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM . 2, 4 (Jan. 2024), 347–365. DOI:https://doi.org/10.55047/ijateis.v2i4.988.