[1]
Adam, I., Witjaksana, B. and TJendani, H.T. 2024. TIME AND COST ANALYSIS ON PROCUREMENT OF SUTET 275 Kv 2CCT QUADRUPLE ZEBRA GUMAWANG – GITET LAMPUNG 1 USING TIME COST TRADE OFF METHOD. INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM . 3, 1 (Jan. 2024), 57–73. DOI:https://doi.org/10.55047/ijateis.v3i1.992.