(1)
Putranto, Y. P.; Patriadi, A.; Sajiyo, S. Analysis of Project Time Using the Earned Value Method Concept on the Situbondo District Bagor Bridge Replacement Project. Int. J. Adv. Technol. Eng. Inform. Syst. 2025, 4, 48-63.