(1)
Rudiansyah, R.; Tjendani, H. T.; Puspanantasari, E. Time and Cost Analysis Using the Fast Track Method in the ITS Bank Building Construction Project. Int. J. Adv. Technol. Eng. Inform. Syst. 2025, 4, 373-382.