(1)
Alamsyah, A. M.; Witjaksana, B.; Purnama, J. Analysis of Construction Project Duration Acceleration Through Workforce Addition Using the Crashing Method at SD Negeri 2 Murtajih Building. Int. J. Adv. Technol. Eng. Inform. Syst. 2026, 4, 527-541.