(1)
Prasetiyo W., A.; Oetomo, W.; Wulandari, E. COMPARATIVE ANALYSIS OF ACCELERATION ALTERNATIVES FOR THE DRAINAGE CHANNEL PROJECT ON XYZ STREET USINGTHE TIME-COST TRADE-OFF (TCTO) METHOD. IJATEIS 2023, 2, 155-174.