(1)
Nugraha, B. A.; Tjendani, H. T. .; Witjaksana, B. . COST AND TIME ANALYSIS USING THE CRASHING METHOD ON THE PROBOLINGGO – BANYUWANGI TOLL ROAD PROJECT PEKET 2: STA 9+000 – 20+200. IJATEIS 2024, 2, 387-399.