Putra, H. R., Koespiadi, K., & Oetomo, W. (2024). TIME AND COST ACCELERATION ANALYSIS USING CRASHING METHOD (CASE STUDY: TANJUNG UNCANG JETTY CONSTRUCTION PROJECT BATAM CITY). INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM, 3(1), 82–91. https://doi.org/10.55047/ijateis.v3i1.1018