Pramadha, I. Y., Tjendani, H. T., & Witjaksana, B. (2024). COST AND TIME ANALYSIS USING EARNED VALUE METHOD ON THE CONSTRUCTION OF THE NATIONAL KEDIRI AIRPORT ACCESS ROAD PHASE 1 KEDIRI - NGANJUK. INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM, 3(1), 119–130. https://doi.org/10.55047/ijateis.v3i1.1023