Irniawan, D., Oetomo, W. ., & Marleno, R. . (2024). COST AND TIME ANALYSIS USING EARNED VALUE METHOD IN ADMINISTRATION BUILDING CONTRUCTION PROJECT AT POLIJE CAMPUS. INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM, 2(4), 423–432. https://doi.org/10.55047/ijateis.v2i4.1059