Nailufar, L., Witjaksana, B. ., & Wulandari , E. . (2024). ANALYSIS OF PROJECT ENFORCEMENT DELAYS WITH THE EARNED VALUE METHOD: (Case study: Office of Bahtera Elang Perak Indonesia Surabaya). INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM, 3(3), 317–330. https://doi.org/10.55047/ijateis.v3i3.1167