Sartiyana, I. K. R., Nugroho, L. D., & Muhammadun, H. (2025). Time and Cost Control Analysis of the Construction of the Joyoboyo Zoo Intermodal Terminal Pedestrian Tunnel Using the Critical Path Method . INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM, 4(1), 18–25. https://doi.org/10.55047/ijateis.v4i1.1566