Putranto, Y. P., Patriadi, A., & Sajiyo, S. (2025). Analysis of Project Time Using the Earned Value Method Concept on the Situbondo District Bagor Bridge Replacement Project. INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM, 4(1), 48–63. https://doi.org/10.55047/ijateis.v4i1.1575