Prasetiyo W., A., Oetomo, W., & Wulandari, E. (2023). COMPARATIVE ANALYSIS OF ACCELERATION ALTERNATIVES FOR THE DRAINAGE CHANNEL PROJECT ON XYZ STREET USINGTHE TIME-COST TRADE-OFF (TCTO) METHOD. INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM, 2(3), 155–174. https://doi.org/10.55047/ijateis.v2i3.882