Nugraha, B. A., Tjendani, H. T. ., & Witjaksana, B. . (2024). COST AND TIME ANALYSIS USING THE CRASHING METHOD ON THE PROBOLINGGO – BANYUWANGI TOLL ROAD PROJECT PEKET 2: STA 9+000 – 20+200. INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM, 2(4), 387–399. https://doi.org/10.55047/ijateis.v2i4.984