PUTRA, H. R.; KOESPIADI, K.; OETOMO, W. TIME AND COST ACCELERATION ANALYSIS USING CRASHING METHOD (CASE STUDY: TANJUNG UNCANG JETTY CONSTRUCTION PROJECT BATAM CITY). INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM , [S. l.], v. 3, n. 1, p. 82–91, 2024. DOI: 10.55047/ijateis.v3i1.1018. Disponível em: https://ojs.transpublika.com/index.php/IJATEIS/article/view/1018. Acesso em: 2 jul. 2024.