PRAMADHA, I. Y.; TJENDANI, H. T.; WITJAKSANA, B. COST AND TIME ANALYSIS USING EARNED VALUE METHOD ON THE CONSTRUCTION OF THE NATIONAL KEDIRI AIRPORT ACCESS ROAD PHASE 1 KEDIRI - NGANJUK. INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM , [S. l.], v. 3, n. 1, p. 119–130, 2024. DOI: 10.55047/ijateis.v3i1.1023. Disponível em: https://ojs.transpublika.com/index.php/IJATEIS/article/view/1023. Acesso em: 2 jul. 2024.