CAHYONO, B.; MARLENO, R.; OETOMO, W. COST AND TIME ANALYSIS USING THE EARNED VALUE METHOD IN THE CONSTRUCTION PROJECT OF THE BPBD BUILDING COMPLEX IN PASURUAN DISTRICT. INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM , [S. l.], v. 2, n. 4, p. 400–411, 2024. DOI: 10.55047/ijateis.v2i4.1043. Disponível em: https://ojs.transpublika.com/index.php/IJATEIS/article/view/1043. Acesso em: 2 jul. 2024.