NAILUFAR, L.; WITJAKSANA, B. .; WULANDARI , E. . ANALYSIS OF PROJECT ENFORCEMENT DELAYS WITH THE EARNED VALUE METHOD: (Case study: Office of Bahtera Elang Perak Indonesia Surabaya). INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM, [S. l.], v. 3, n. 3, p. 317–330, 2024. DOI: 10.55047/ijateis.v3i3.1167. Disponível em: https://ojs.transpublika.com/index.php/IJATEIS/article/view/1167. Acesso em: 14 mar. 2026.