PUTRI, D. C.; WITJAKSANA, B. .; TJENDANI , H. T. . TIME DELAY ANALYSIS USING CRITICAL PATH METHOD (CPM) (Case Study: Kerobokan Bali Parking Building Construction Project). INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM, [S. l.], v. 3, n. 4, p. 502–517, 2024. DOI: 10.55047/ijateis.v3i4.1189. Disponível em: https://ojs.transpublika.com/index.php/IJATEIS/article/view/1189. Acesso em: 24 apr. 2026.