KLAU, M. J.; SAJIYO, S.; TJENDANI, H. T. TIME ACCELERATION ANALYSIS USING THE TIME COST TRADE OFF METHOD ON THE WHEAT SILO AND PELLET SILO STRUCTURE REPAIR PROJECT PHASE III IN SURABAYA. INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM, [S. l.], v. 3, n. 3, p. 385–395, 2024. DOI: 10.55047/ijateis.v3i3.1254. Disponível em: https://ojs.transpublika.com/index.php/IJATEIS/article/view/1254. Acesso em: 24 apr. 2026.