SARTIYANA, I. K. R.; NUGROHO, L. D.; MUHAMMADUN, H. Time and Cost Control Analysis of the Construction of the Joyoboyo Zoo Intermodal Terminal Pedestrian Tunnel Using the Critical Path Method . INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM, [S. l.], v. 4, n. 1, p. 18–25, 2025. DOI: 10.55047/ijateis.v4i1.1566. Disponível em: https://ojs.transpublika.com/index.php/IJATEIS/article/view/1566. Acesso em: 14 mar. 2026.