PUTRANTO, Y. P.; PATRIADI, A.; SAJIYO, S. Analysis of Project Time Using the Earned Value Method Concept on the Situbondo District Bagor Bridge Replacement Project. INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM, [S. l.], v. 4, n. 1, p. 48–63, 2025. DOI: 10.55047/ijateis.v4i1.1575. Disponível em: https://ojs.transpublika.com/index.php/IJATEIS/article/view/1575. Acesso em: 14 mar. 2026.