RUDIANSYAH, R.; TJENDANI, H. T.; PUSPANANTASARI, E. Time and Cost Analysis Using the Fast Track Method in the ITS Bank Building Construction Project. INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM, [S. l.], v. 4, n. 3, p. 373–382, 2025. DOI: 10.55047/ijateis.v4i3.1824. Disponível em: https://ojs.transpublika.com/index.php/IJATEIS/article/view/1824. Acesso em: 21 feb. 2026.