ALAMSYAH, A. M.; WITJAKSANA, B.; PURNAMA, J. Analysis of Construction Project Duration Acceleration Through Workforce Addition Using the Crashing Method at SD Negeri 2 Murtajih Building. INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM, [S. l.], v. 4, n. 4, p. 527–541, 2026. DOI: 10.55047/ijateis.v4i4.2132. Disponível em: https://ojs.transpublika.com/index.php/IJATEIS/article/view/2132. Acesso em: 7 mar. 2026.