AL- QORDHOWI, A. F. Y.; JANI, M. A.; MOETRIONO, H. INTEGRATED CONTROL PROJECT BASED ON COST AND TIME: (Implementation Case Study on Job Creation Construction of Videotron LED 6m x 12m in size Baliwerti Project Surabaya). INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM , [S. l.], v. 2, n. 1, p. 52–73, 2023. DOI: 10.55047/ijateis.v2i1.695. Disponível em: https://ojs.transpublika.com/index.php/IJATEIS/article/view/695. Acesso em: 2 jul. 2024.