PRASETIYO W., A.; OETOMO, W.; WULANDARI, E. COMPARATIVE ANALYSIS OF ACCELERATION ALTERNATIVES FOR THE DRAINAGE CHANNEL PROJECT ON XYZ STREET USINGTHE TIME-COST TRADE-OFF (TCTO) METHOD. INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM , [S. l.], v. 2, n. 3, p. 155–174, 2023. DOI: 10.55047/ijateis.v2i3.882. Disponível em: https://ojs.transpublika.com/index.php/IJATEIS/article/view/882. Acesso em: 2 jul. 2024.