NUGRAHA, B. A.; TJENDANI, H. T. .; WITJAKSANA, B. . COST AND TIME ANALYSIS USING THE CRASHING METHOD ON THE PROBOLINGGO – BANYUWANGI TOLL ROAD PROJECT PEKET 2: STA 9+000 – 20+200. INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM , [S. l.], v. 2, n. 4, p. 387–399, 2024. DOI: 10.55047/ijateis.v2i4.984. Disponível em: https://ojs.transpublika.com/index.php/IJATEIS/article/view/984. Acesso em: 2 jul. 2024.