Nailufar, Linda, Budi Witjaksana, and Esti Wulandari. 2024. “ANALYSIS OF PROJECT ENFORCEMENT DELAYS WITH THE EARNED VALUE METHOD: (Case Study: Office of Bahtera Elang Perak Indonesia Surabaya)”. INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM 3 (3):317-30. https://doi.org/10.55047/ijateis.v3i3.1167.