Putranto, Yonandika Pandu, Andi Patriadi, and Sajiyo Sajiyo. 2025. “Analysis of Project Time Using the Earned Value Method Concept on the Situbondo District Bagor Bridge Replacement Project”. INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM 4 (1):48-63. https://doi.org/10.55047/ijateis.v4i1.1575.