Ariyanto, Subkhan, Hanie Teki Tjendani, and Budi Witjaksana. 2024. “TIME AND COST ACCELERATION ANALYSIS USING CRASHING METHOD WITH ADDITIONAL WORKING HOURS IN THE CONSTRUCTION PROJECT OF KAPAS – GLENDENG 8 BRIDGE, BOJONEGORO DISTRICT”. INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM 2 (4):273-93. https://doi.org/10.55047/ijateis.v2i4.974.