Nugraha, Budidarma Ardi, Hanie Teki Tjendani, and Budi Witjaksana. 2024. “COST AND TIME ANALYSIS USING THE CRASHING METHOD ON THE PROBOLINGGO – BANYUWANGI TOLL ROAD PROJECT PEKET 2: STA 9+000 – 20+200”. INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM 2 (4):387-99. https://doi.org/10.55047/ijateis.v2i4.984.